Accessory Dwelling Units (ADUs)

A site plan submittal is required when applying for a permit involving an ADU.

Upon payment of all fees and evidence of a city building permit, a sewer permit may be issued to the party contracted to do the underground construction.

After obtaining a permit, call 24 hours before beginning sewer construction to schedule an inspection.

Accessory Dwelling Unit Application

Homeowner Information Brochure

Permit Application

Lateral Installation Guide

Permit Fees and Deposit:

Permit Fee     $50.00
Inspection Fees:    
- Property Line to Building   $150.00
- Main to Property Line (unless previously existing/inspected)   $150.00
Subtotal   $350.00
Deposit (refundable after acceptance)   $500.00
Total Fees and Deposit:   $850.00
 

usd logo bottom

Copyright 2016-2018 Union Sanitary District | Search | Site Map | Designed by Formula Design